TORABI, S., FATEMI GHOMI, S. & KARIMI, B. (2005). THE ECONOMIC LOT AND DELIVERY SCHEDULING PROBLEM IN FLEXIBLE JOB SHOPS. Amirkabir Journal of Science and Research, 36(1), 18–18.
MLA
TORABI, S., FATEMI GHOMI, S., & KARIMI, B. "THE ECONOMIC LOT AND DELIVERY SCHEDULING PROBLEM IN FLEXIBLE JOB SHOPS", Amirkabir Journal of Science and Research, 36, 1, 2005, 18–18.
HARVARD
TORABI, S., FATEMI GHOMI, S., & KARIMI, B. (2005). 'THE ECONOMIC LOT AND DELIVERY SCHEDULING PROBLEM IN FLEXIBLE JOB SHOPS', Amirkabir Journal of Science and Research, 36(1), pp. 18–18.
CHICAGO
TORABI, S., FATEMI GHOMI, S. & KARIMI, B., "THE ECONOMIC LOT AND DELIVERY SCHEDULING PROBLEM IN FLEXIBLE JOB SHOPS." Amirkabir Journal of Science and Research, 36 1 (2005): 18–18,
VANCOUVER
TORABI S., FATEMI GHOMI S., KARIMI B. THE ECONOMIC LOT AND DELIVERY SCHEDULING PROBLEM IN FLEXIBLE JOB SHOPS. AJSR. 2005;36(1):18–18 (In Persian).